Skip to main content

Posts

Showing posts from May, 2020

Plate Load Test as Per IS:1888-1982

👷We are Conduct Plate Load Test for  Minor Bridge where required SBC-150 kn/m2🚧 Step-1 First survey the site area and selected a suitable location for test pit as decided by Engineer or mentioned in Drawing. Step-2 Marked the area and clean or excavation as required for locate to the foundation bed level or pcc bottom level. Step-3 Filled Sand bags for Loading arrangement as required for achieve the dead loads Step-4 Prepared the dead load structure by using sand bags, ISB (We are used 300 & 250mm), shuttering plate or any other suitable methods as required to achieve ultimat load Step-5 ###Calculation###                                                 DEAD LOAD CALCULATION Sl. No Descriptions of lo...