DBM and BC Work

Day-1
Visiting Aggregate Stock Yards at Plant
Day-2
Check Plant Operations with plant Operator.
Day-3
After checked out the plant Next step is collection of dry  Aggregate sample from Hot bin as required for mix.(it's depends on max agg. Size mention in specified design by MORTH 5th Rev.)

In this batch mix plant has contains 5 types of sieve adjustments in rotary screen.
(1)40mm/30mm
(2)26.5mm
(3)16mm
(4)7mm
(5)4.5mm

Plant Sievers may be changed with requirements for adjusted to Mix.

Now Collected Sample
Day-4
Sieve Analysis of all individual four Sample (3 time of Each and take Average value)

Result of Individual Gradation


  • Sample-1 (40-26.5mm)  

Gradation ðŸ‘ˆ














Comments

  1. During this post, you have shared fantastic content about Laboratory Management Software Company. This article provided me with some useful knowledge. Thank you for sharing that. Keep up the good work.

    ReplyDelete
  2. Contract Scope of Work:The scope of work describes the key components of a project and provides the client with a general idea of what will be needed to finish a job. This blog post will go over the many components of the scope of work, such as the project's history, the services the organisation provides, and the project's objectives.

    ReplyDelete

Post a Comment

Popular Posts